Bush Mead Primary School

Location – St Neots, CambridgeMain Contractor – Bush Mead Primary School before after A 22mm Junckers Beech floor was laid to a new build primary school in 2001. The floor had been poorly cleaned over the years without carrying out any maintenance to the floor. Pica...

Ebury Street

Location – Belgravia, LondonMain Contractor – Talbot Construction This refurbishment of 24 first-rate apartments is located in Belgravia, carried out in 2 phases over a period of one year. There was a mix of three Ted Todd finishes, Pickled Oak, Sienna and a project...

Chiswick High Road

Location – Chiswick High Road, LondonMain Contractor – Neilcott A prestigious development of 7 luxury apartments required a quality floor throughout all areas to compliment the high specification sought by the developer. Kahrs Oak Hampshire was laid as a floating...

Simpsons Farm

Location – Wrabness, EssexMain Contractor – Rose Builders Designed in conjunction with Greyson Perry, this individually designed holiday home was inspired by a love story. The installation in the living room of the fumed and natural oak chevron floor provides a...

Herbert Crescent

Location – Knightsbridge, London, SW1Main Contractor – ISG Located in Belgravia, this prestigious project was finished to a very high specification demanded by the Client.Laid to a traditional pattern of chevron, the prime grade prefinished oak blocks were laid...